Beginning Wednesday September 7th, 2022 Gee Asphalt will have the outside lanes of the Wapello Street Extension closed to place seal coat surfacing on the road. During this closure, the contractor will leave one entrance into the park open at all times. Motorists are advised to slow down, be alert and follow traffic control direction.
On Thursday September 8th, 2022 the contractor will close the inside lanes and the turning lanes at the park entrances to apply the surfacing. During this closure, access to the park will limited to the direction of travel. Motorists will not be able to cross the center lanes as a method of ingress and egress to and from the park. Again, motorists are advised to slow down, be alert and follow traffic control direction. Work is subject to weather conditions.
Original source can be found here.